Specifications include, but are not limited to: 2.5.1.Cylinder will be compliant with the Interstate Commerce Commission (ICC) and Department of Transportation (DOT) rules and regulation, complete with all fittings, valves and caps, in good working order and free of dirt, debris and rust.; 2.5.2.Purchaser may reject any delivered cylinder that shows evidence of neglect or abuse or leak, which the Contractor will replace within 24 hours of notification at no additional cost to the State.; 2.5.3.Cylinder will be maintained, tested, filled, marked, labeled and shipped in accordance with ICC and DOT regulations.; 2.5.4.Cylinder will be stamped with the pressurization test expiration date. ; 2.5.5.Cylinders will be legible marked by means of stenciling, stamping, or labeling to identify the contents by the common chemical name or mixture, with lettering height no less than ¼” and markings will not be readily removable. Each cylinder will shoe a legible serial number and/or bar code.; 2.5.6.Cylinder will show capacity contained within and be filled to the identified capacity. Cylinder will have an expiration date for the gas within when applicable.; 2.5.7.Medical cylinder will be labeled in accordance with USP requirements displayed accepted technical terminology, batch and control numbers, etc. Gas purity will meet USP specifications.; 2.5.8.Purchasers have the right to reject cylinders that are defective or cosmetically unsuitable for use within a healthcare facility.; 2.5.9.Non-compliance with any of the above standards is grounds for purchaser not accepting deliveries or raising questions with the Contractor and/or the OPC Contract Manager.