Specifications include, but are not limited to: 0005 201001-000 CLEARING AND GRUBBING LUMP SUM LUMP SUM _________._____ 0010 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0015 207001-001 UNCLASSIFIED EXCAVATION CY 649.000 _________._____ _________._____ 0020 207002-000 SUBGRADE CY 291.000 _________._____ _________._____ 0025 207034-000 FABRIC FOR SEPARATION SY 1,728.000 _________._____ _________._____ 0030 211001-000 UNCLASSIFIED BORROW EXCAVATION CY 49.000 _________._____ _________._____ 0035 211002-000 ROCK BORROW EXCAVATION CY 23.000 _________._____ _________._____ 0040 212010-003 SHORING LUMP SUM LUMP SUM _________._____ 0045 240001-000 CLEAN CULVERT LF 45.000 _________._____ _________._____ 0050 307001-000 AGGREGATE BASE COURSE, CLASS 1 CY 288.000 _________._____ _________._____ 0055 307001-000 AGGREGATE BASE COURSE, CLASS 10 CY 2.600 _________._____ _________._____ 0060 415005-001 STANDARD MILLING SY 22.300.