Specifications include, but are not limited to: The scope of work includes: reconstruction/rehabilitation of pavement and pavement widening; improvements to intersecting streets and horizontal and vertical transitions; install new concrete valley gutters, replace existing concrete valley gutters, and replace existing concrete valley gutters with asphalt pavement; replace substandard ADA facilities: sidewalk, ramps, traffic signal push buttons, and pedestrian facilities; install or repair damaged curb, gutter, and sidewalk areas; provide bicycle lanes and pavement markings; storm drain facilities; utility modifications and relocations; street lighting modifications with LED upgrades and new lighting; ITS conduit and fiber with pull boxes and other appurtenances; upgrade traffic signals at intersections and install new loop detectors; upgrade/replace all signing.