Specifications include, but are not limited to: A. CW1 Clearwell- New actuator/gear box above clear well, stem and torque tube for two 66” Influent valves and two 54” Effluent valves B. CW2 Clearwell- New 12-inch valves, actuator/gear box above clearwell, stem and torque tube for four 12” drain valves C. CW5 Eff Vault- Replace vacuum relief rupture disks, obtain spare disks and clean vent tubes D. FLT3 Filtration- Replace eight turbidimeters E. PACl1- Replace two existing metering pumps with three new pumps F. PACl2- Add Tank(s) for tote transfer and use G. SED1- Sed Refurbishment of guide rail in North Sedimentation Basin H. SED2- Monitoring and replacement of 4 longitudinal collector drives and 2 cross collector drives.