Specifications include, but are not limited to: replacement of the on-site septic system for the home located at 46458 Grace Lake Rd,Sandstone; 1. It is the Contractors responsibility to identify any and all discrepancies in the scope of work, notmeeting Industry Standards or that which is inconsistent with the MN Chapter 7080 and Mille LacsBand of Ojibwe 2016 MLB Project Specification Book.2. All electrical wiring, apparatus and equipment for electric light, heat and power, technology circuitsor systems shall comply with the rules of the Department of Commerce or the Department ofLabor and Industry, as applicable, and be installed in conformity with accepted standards ofconstruction for safety to life and property.3. Contractor must reconnect all utilities, service panel or service feed.4. Contractor will secure all permits and fees.5. Contractor is responsible for a thorough investigation of the scope of work.6. Contractor will repair any damage to the property or structure created by the scope of work.7. Contractor shall be responsible for all debris removal related to all work performed under this workscope.