Specifications include, but are not limited to: Avalanche Trail: 1. Water 6” .280W DRL supply, Zap-Lok, install 2200ft_______________________________________ 2. Shallow bury trench_ ____________________ 200ft________________________________________ 3. Clean-up and revegetation___________________2200ft_______________________________________ 4. Water line hydrant coupling supply and install___18ea________________________________________ 5. Install one water valve top and tie-in drain at bottom__________________________________________ 6. Tie-ins__________________________________12ea_________________________________________ 7. Replace valve station foundation, remove and reinstall valving__________________________________ 8. Employee hourly pay rates_______________________________________________________________ Peabody main snowmaking water line: 1. Dig down and patch pipe where 4” spur(drain) is attached______________________________________ 2. Employee hourly pay rates_______________________________________________________________ Brookside Trail: 1. Water 4” .237W DRL supply, Zap-Lok, install___950ft________________________________________ 2. Shallow bury trench________________________300ft________________________________________ 3. Clean-up revegetation______________________ 950ft________________________________________ 4. Water line coupling supply and install__________10ea________________________________________ 5. Air line coupling supply and install_____________3ea_________________________________________ 6. Supply/install two drain valves at bottom________2ea_________________________________________ 7. Tie-ins___________________________________4ea_________________________________________ 8. Upper valve station_tie-in____________________1ea_________________________________________ 9. Extend lines 150’ down from current location____150ft________________________________________ 10. Employee hourly pay rates_______________________________________________________________