Specifications include, but are not limited to: Gail Road Contract will consist of two phases: Phase IA is the installation of storm drainage piping and pre-cast concrete catch basins including reconstructing the road per plans. Phase IB is to shim and overlay 1” of pavement STA 6+55 to STA 11+ 75. Phase II is to install underdrain pipe along the north side of Jay Road to Catch Basin 718. Also to install underdrain on the south side or Jay Road down the west side of Gail Road. Install two new Catch Basins and piping as needed to remove the room ball, as shown on sheet 4 of the plans. The road from Catch Basin 716 to Joey Road shall be hot bituminous pavement (2” base course + 1” wearing course), loam & seed. NOTE: Maintenance of traffic and other incidental construction items shall apply throughout the project