Specifications include, but are not limited to: Bridge Items 403.21053 HBP-3/8" MIX, MACHINE METHOD (BRIDGE BASE) TON 110.00 403.26 PAVEMENT JOINT ADHESIVE (BRIDGE BASE) LF 2,050.00 403.29 HBP-TEMPORARY (BRIDGE) TON 32.00 502. REMOVAL OF EXISTING BRIDGE STRUCTURE U 1.00 504.1 COMMON BRIDGE EXCAVATION (F) CY 60.00 511.00 CONCRETE BRIDGE DECK PAVEMENT REMOVAL (F) SY 1,924.00 511.02 PREPARATION FOR PARTIAL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 192.00 511.03 PREPARATION FOR FULL DEPTH CONCRETE BRIDGE DECK REPAIRS SY 10.00 520.01 CONCRETE CLASS AA CY 52.00 520.0201 CONCRETE CLASS AA, ABOVE FOOTINGS CY 32.00 520.02013 CONCRETE CLASS AA, ABOVE FOOTINGS (FULL DECK REPAIR) CY 3.00 534.3 WATER REPELLENT (SILANE/SILOXANE) GAL 180.00.