Specifications include, but are not limited to: replacement of HVAC and associated work at the DelDOT Administration Building in Dover, DE.; 1. Demolition of existing HVAC System; 2. Installation of new HVAC Equipment, Ductwork and Appurtenances.; 3. Demolish and replace existing Ceilings.; 4. Selective modification of architectural features as required for completion of mechanical work, including patching and painting.; 1. Manufacturers of all coils shall ensure that the coils are clean and free of any residue from the manufacturing and shipping process. If coils are found to be dirty or smoke when hot water is provided to them, the contractor will be responsible for cleaning of the coils, as well as, cleaning the building from smoke, coil emanations, or vapors.; 2. The return airflows indicated on the plans correspond to the occupied mode with minimum outside air being supplied. The balance report is to indicate these airflows in this mode of operation.; 3. HVAC equipment shall be furnished with a motor starter suitable for the off-on control of the motor by a remote thermostat or bas contact. These starters shall comply with national electric code.; 4. All air handling units are to be installed to provide adequate, unobstructed, access and clearance for air filter replacement.; 5. Notify the owner in the event any existing hazardous materials, such as asbestos, pcb's, lead, etc., are encountered on the project. The owner will arrange with a qualified specialist for the identification, testing, removal, handling and protection against exposure or environmental pollution, to comply with applicable regulations, laws and ordinances.; 6. All thermostats shown on hvac plans are to be mounted 4'-0" maximum aff (top of unit), unless noted otherwise. Contractor is responsible for mounting & wiring all thermostats. Plenum rated cables must be used.; 7. Prior to submitting bid, the contractor shall visit the site and be thoroughly familiar with the existing conditions and proposed construction. Contractor shall include in their bid all materials, labor and all incidentals for a complete installation whether specifically indicated or not. All errors, discrepancies and missed items shall be brought to the attention of the engineer during the bidding process by the contractor. These items shall be included in the bid price. No extra cost will be allowed for any discrepancy which could have been noticed at the site by the contractor.; 8. The contractor shall be responsible for all additional costs incurred as a result of substitutions or deviations from the basis of design shown on these drawings.; 9. Contractor is responsible for providing transitions and flexible connections between all units and supply, return, or outside air ducts.; 10. All roof and wall penetrations shall be sleeved and sealed for assembly rating.