Specifications include, but are not limited to: addition of new accessible basement entrances and31exterior accessible concrete ramps from grade to the basement level of both Humphrey32and Jorns Halls on the University of Wisconsin – Madison campus. The work includes a33concrete ramp with retaining walls, exterior door, power door operator and site drain at34the exterior door. Interior steam piping will be rerouted around the new exterior doors by35the owners. Installation of plumbing work and all work shown on the architectural36drawings is included in the project. All Mechanical and Electrical work will be performed37by the owner and timing of this work will need to be coordinated with work being performed38as part of the project scope.