Specifications include, but are not limited to: 10 640.0001.0000 Mobilization and Demobilization All Required Lump Sum Lump Sum 20 642.0001.0000 Construction Surveying All Required Lump Sum Lump Sum 30 642.0003.0000 Three Person Survey Party 30 Hour 40 643.0002.0000 Traffic Maintenance All Required Lump Sum Lump Sum 50 643.0023.0000 Traffic Price Adjustment All Required Contingent Sum Contingent Sum $0.00 60 643.0025.0000 Traffic Control All Required Contingent Sum Contingent Sum $85,000.00 70 643.2005.0000 Public Information Program All Required Lump Sum Lump Sum 80 644.0001.0000 Field Office All Required Lump Sum Lump Sum 90 644.2002.0000 Field Communications All Required Contingent Sum Contingent Sum $5,000.00 100 646.0001.0000 CPM Scheduling All Required Lump Sum Lump Sum Erosion, Sediment, and Pollution Control Without CGP Coverage 110 658.0001.0000 All Required Lump Sum Lump Sum 120 658.0002.0000 ESCP Changes by Directive All Required Contingent Sum Contingent Sum $0.00 Highway Lighting System Complete, North Pole - City Core 130 660.0003.0000 All Required Lump Sum Lump Sum 140 661.0002.0000 Load Center, Type 1A 3 Each 150 661.0004.0000 Load Center, Type 3 1 Each 160 682.2005.0000 Utility Pothole All Required Contingent Sum Contingent Sum $35,000.00 Contaminant Soil Removal and Disposal, SVOCs and PFAS 170 802.2000.0000 All Required Contingent Sum Contingent Sum $1.00