Specifications include, but are not limited to: 1. Cleaning and Installation of approximately 20 feet of sectional CIPP lining within existing 21-inch and 36-inch diameter sewer siphons. 2. Cleaning and Installation of approximately 2,700 linear feet of manhole-to-manhole CIPP liner within existing 8- to 36-inch diameter sewer siphons. 3. Repair a hole in Main Street siphon prior to CIPP. 4. Perform testing of CIPP and correct all failures and/or leaks. 5. Restore pavement surfaces, curbing, utilities, retaining walls, granite walls, shrubbery, grass, posts, signs, etc. disturbed by CONTRACTOR’s activities. 6. Maintain sewage flows during all construction activities. 7. Contractor to support and protect all exiting utilities in accordance with the requirements of the utility owner within the project work areas during all construction activities. 8. Maintaining sedimentation and erosion control measures during construction.