Specifications include, but are not limited to: installation of a reinforced concrete perimeter31curbing on select areas of Level 5. Curbing includes modifications to pedestrian32barriers between precast stitch walls, elastomeric sealant work, urethane traffic33membrane work.3435Level 2 work includes the select repair of precast TT edges, TT to TT shear connection36weld inspection and repairs, removal and replacement of all TT joint sealant to limits,37installation of urethane hybrid traffic membrane over existing unknown traffic38membrane and bare concrete. Traffic painting of directional arrows to be performed.39The removal and replacement of adjacent metal pedestrian railings are required.40Phasing of work is required to maintain one functioning entry traffic lane to parking41structure at all times.