Specifications include, but are not limited to: The installation of interconnecting piping and 33 instrumentation conduit and cabling and low voltage power conduit and cabling to a new 34 air compressor provided and installed by the University. Piping to be installed includes 35 process air piping, lake water (cooling water) supply and return piping, and compressor 36 drain piping. Electrical work consists installation of a 480V power feed to the compressor 37 and installation of instrumentation and control wiring to the new compressor and system 38 instruments. Existing air compressor demolition and removal, new housekeeping pad, and 39 new air compressor package including setting of unit in place will be completed by the 40 University. A 480V fused disconnect switch and breaker will be supplied by the University.