Specifications include, but are not limited to: 2021.501 MOBILIZATION LUMP SUM 1.00 2104.504 REMOVE BITUMINOUS PAVEMENT SQ. YD. 18250.00 2105.607 COMMON EXCAVATION (P) CU. YD 9694.00 2108.804 GEOTEXTILE FABRIC, TYPE V SQ. YD. 19630.00 2105.609 SELECT GRANULAR BORROW TON 14299.00 2211.509 AGGREGATE BASE CL. 5 TON 14084.00 2357.506 BITUMINOUS MATERIAL FOR TACK COAT GAL 871.00 2360.509 TYPE SP 12.5 WEARING COURSE (2,C) TON 4438.00 2502.503 4" HDPE PERF. PIPE DRAIN LIN. FT. 6291.00 2504.608 WATERMAIN FITTINGS LBS. 1215.00 2504.603 8" WATERMAIN, C-900 LIN. FT. 2092.00 2506.503 CONSTRUCT DRAINAGE STRUCTURE LIN. FT. 180.90 2531.503 CONCRETE CURB & GUTTER, B-618 LIN. FT. 404.00 2531.503 CONCRETE CURB & GUTTER, B-624 LIN. FT. 2659.00 2531.504 6"TH CONCRETE DRIVEWAY PAVEMENT SQ. YD. 546.00 2573.501 STABILIZED CONSTRUCTION EXIT EACH 7.00 2575.504 SODDING, TYPE LAWN SQ. YD. 5946.00