Specifications include, but are not limited to: renovation of the warehouse building, to covert an existing warehouse space into a wellness center, it also includes the renovation of existing restrooms for the new wellness center. Work included demolition of existing masonry walls, doors and windows, plumbing fixtures, lockers, hot water heater, light fixtures, suspended acoustical ceiling, saw cutting of existing concrete slab. Tie-in to existing sewer line, interior partitions, interior and exterior doors, toilet compartments, restroom accessories, lockers, suspended acoustical ceiling, exterior and interior doors, interior finishes, painting, MEP Engineering to include HVAC, electrical and plumbing work.; A. Owner’s BIM360 platform will be utilized for Document Management, RFI’s, Submittals, Project Management, field inspections, and punch list. Owner will provide BIM360 licenses for the Contractor to use. Contractor will maintain all project records utilizing the Owner’s BIM360 platform.; B. Permits and Fees: Apply for, obtain, and pay for permits, if applicable, fees, and utility company back charges required to perform the work. Contractor is responsible for contacting the local service providers (municipality, water, electric, and communications). Refer to plans for additional information. Contractor shall coordinate all inspections on site with TxDOT Project Manager.; C. Codes: Comply with applicable codes and regulations indicated on coversheet of Construction Drawings. Submit copies of inspection reports, notices and similar communications to Owner.; D. Dimensions: Verify dimensions indicated on drawings with field dimensions before fabrication or ordering of materials. Do not scale drawings.; E. Existing Conditions: Notify Owner of existing conditions differing from those indicated on the drawings. Do not remove or alter structural components without prior written approval of the Owner, Architect and Engineer of record.; F. Coordination: 1. Coordinate the work of all trades.; 2. Prepare coordination drawings for areas above ceilings where close tolerances are required between building elements and mechanical and electrical work.; 3. Verify location of utilities and existing conditions prior to beginning work.; 4. Schedule all work on site with TxDOT Project Manager.; G. Installation Requirements, General: 1. Inspect substrates and report unsatisfactory conditions in writing.; 2. Do not proceed until unsatisfactory conditions have been corrected.; 3. Take field measurements prior to fabrication where practical. Form to required shapes and sizes with true edges, lines and angles. Provide inserts and templates as needed for work of other trades.; 4. Install materials in accordance with Manufacturer’s instructions and approved submittals.; 5. Install materials in proper relation with adjacent construction and with proper appearance.; 6. Restore units damaged during installation. Replace units which cannot be restored at no additional expense to the Owner.; 7. Refer to additional installation requirements and tolerances specified under individual specification sections.