Specifications include, but are not limited to: General carpentry and small building assignments as well as grounds maintenance and repairs, and other incidental work.; x Contractor or Designee shall have the ability to perform highly skilled carpentry and building tasks independently, including framing and/or finish carpentry.; x The Contractor shall provide all equipment and tools necessary for the proper and safe accomplishment of the work. Equipment shall be well maintained and in good working order.; x Contractor or Designee shall have the ability to read, interpret, and construct a project from plans and specifications.; x Contractor or Designee shall provide a reliable vehicle (Service Truck) and fuel to transport employees to and from the workplace during scheduled hours, and after hours if necessary.; x Contractor or Designee Vehicle shall have the ability to transport all tools, supplies, and equipment needed for job duties, as well as standard building materials (such as several 2”x12”x12’ boards, plywood, shingles etc.).; x Contractor or Designee shall have knowledge of all state and federal codes that pertain to the operation, OSHA Standards, MaineDOT safety policies which will be provided as they relate to movable bridges, building and grounds work.; x Contractor or Designee shall provide proof that any employee that regularly works under this Contract has successfully completed the 30-hour Construction Industry OSHA certification, or the employee shall obtain certification within 6 months at no cost to the Department.; x The Contractor and the employees assigned to perform the work shall have a minimum of three (3) years of experience performing maintenance and repairs.; x Contractor or Designee shall have the ability to competently remove and/or replace/install various roofing materials to include ABC Metal roofing.; x Contractor or Designee shall have the ability to competently remove and/or replace/install various types of building trim and siding, to include, but not limited to, vinyl and metal.; x Contractor shall have the ability to competently remove and replace various types of flooring.; x Contractor or Designee shall have the ability to safely temporarily suspend existing building walls, remove deteriorated material, build forms, and place new concrete risers and re-attach walls with new sill plates.; x Contractor or Designee shall have the ability to competently lay out, build forms, tie rebar, and place concrete to create concrete slabs, footings, risers, and frost walls, as well as placement of floor self-leveling materials as needed.