Specifications include, but are not limited to: • remove existing concrete and trees if necessary and construct new pads; • follow all contract requirements on pages 4-12; • acquire all necessary licenses, certifications, and permits, and payment of fees for same; • have an engineer complete site staking in accordance with ADA requirements prior to excavation; • provide the original PDF file of the site plan when applying for City permits; • provide a pedestrian detour when sidewalks are closed due to construction; • provide a traffic control plan to the City of Topeka in conformance with city standards; • ensure that each site is ADA-accessible from/to curbs and sidewalks; • furnish all labor, material and equipment necessary for satisfactory contract performance; • contractor will complete sod work immediately after pouring concrete and cleaning each site. • provide a one-year warranty from the date of Substantial Completion; • hire all subcontractors and ensure their compliance with contractual requirements; and, • ensure that the completed site is clean, any site damages repaired (i.e. sprinklers, sidewalks) to the property owner’s satisfaction, and ready for use upon completion.