Specifications include, but are not limited to: The project includes removal of an existing large art installation that extends across the existing ceiling and skylights. Contractor to repair drywall and paint to match. Water damage will be confirmed by Facilities staff that it is from a previous leak and that water intrusion is no longer an issue. In addition to the base scope of work, retrofitting fluorescent can light fixtures in an existing ceiling beam with LEDs is desired but will be addressed as an additive alternate in pricing documents. All electrical work associated with this part of the scope is bidder designed. All work will be performed after hours starting at 5pm and must be completed by 7am. Access to Courts, Jail Lobby, and Elevator must be maintained during business hours. This includes accommodations for ADA. The Jail Lobby has visitation hours that extend into the evenings and on the weekends. The contractor will need to provide a schedule to the County Project Manager for approval prior to starting work.