Specifications include, but are not limited to: The City of Rutland is soliciting bids from experienced Contractors to remove and replace sidewalk on the east side of Pierpoint Avenue and the south side of Crescent Street, totaling approximately 1,340 linear feet. The sidewalk to be removed is composed of asphalt. New sidewalks to be installed shall be 5 ft wide concrete as specified in these documents. The City desires to have the work completed in the 2022 construction season. A site plan that illustrates the general layout of the sidewalk project is included. These plans also include general notes and details that must be adhered to. The sidewalk to be removed is composed of asphalt. In some locations, there is no distinction between the shoulder of the road and the sidewalk. As a result, motorists have a tendency to park on the shoulder of the road, creating an impediment to pedestrians and cyclists who are then forced into the roadway. As part of this project, the green belt will be reestablished, providing a safe separation distance between pedestrians and motorists. General notes regarding the work are as follows: • New concrete sidewalk shall be installed to the alignment and grade as specified in field by the City Engineer • Contractor shall remove and dispose of existing sidewalk, asphalt that may exist on the shoulder of road, and all other excess materials • Contractor shall grade, topsoil and seed all disturbed areas • Contractor shall perform any and all tasks necessary to fully accomplish sidewalk removal/installation and site restoration • Payment will be based upon measured quantities of completed bid items