Specifications include, but are not limited to: A. One entity, organization, or company, denoted as the Supplier in the Specifications herein, shall be selected to furnish water filtration equipment and materials required for the Meridian Well 31 Iron and Manganese Removal Project. B. Well 31 will operate with a variable frequency drive. The design of the filter system to operate at full flow conditions without exceeding the maximum forward loading rates listed in Specification Section 11100. Bypass piping and control valve will be provide by the installation contractor. C. The City of Meridian, ID, denoted as the Owner in the Specifications herein, shall award this contract to one Supplier based on selection criteria outlined in the Request For Proposals. D. The general construction contractor, denoted as the Contractor in the Specifications herein, shall be awarded the overall construction contract by the Owner at a later date and following this Supplier selection. E. The overall project (Supplier and Contractor Work) will include installing a new iron and manganese removal filter system at the Owner’s existing Well 31 facility, which is a groundwater well for potable supply. The equipment will be housed inside of a new climate controlled building. The well water will be oxidized with sodium hypochlorite before the filter system, and wasted backwash water will be discharged to the Owner’s sanitary sewer system.