Specifications include, but are not limited to: The City seeks a qualified contractor to complete public facility improvements at the St. Vincent de Paul building and parking area. Work includes installation of code compliant and ADA accessible ramps; (1) Existing sidewalks and curb/gutters are to remain as is, except where noted to be removed and replaced. The existing concrete pad is to remain as is alongside East Terry Street. (1A) Remove existing pavement markings on concrete pad alongside East Terry Street. (2) Remove existing fence, post, stumps, bases and gates. (4) Leave section of fence as is. (7) Extend the existing approach 25’ to the East. Remove and replace the existing concrete curb/gutter and sidewalks. Clean cut and patch asphalt. (10) Remove existing stairs and ramp. (11) Patch/repair the existing concrete at the edge of the existing deck. Grind and patch concrete surface at the door into the food pantry where it is spalled. (12) Remove all items attached, or embedded, in the existing concrete foundation wall at the front of the building with the exception of the vents. The vents are to remain and be painted black. Remove anchor bolts to a depth of 3”. Chip out all existing openings in the wall to provide a clean surface to patch back to. Grind the entire wall and edge of concrete deck to remove loose debris, spalling, etc., prior to patching/ refinishing the wall. After an inspection on the wall preparation finish the wall with a Dryvit (or equivalent) embedded mesh finish system.