Specifications include, but are not limited to: MILL AND OVERLAY APPROXIMATELY 2.82 MILES OF HIGHWAY 10S, AT GREENWOOD, IN SEBASTIAN COUNTY. THIS PROJECT CONSISTS OF EARTHWORK, ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, PAVEMENT MARKING, AND MISC. ITEMS. 207001 STONE BACKFILL 100.00 TON 303107 AGGR.BASE COURSE(CLASS 7) 100.00 TON 401011 TACK COAT 11,197.00 GAL 407162 MA IN ACHM SURFACE(1/2") 6,845.00 TON 407442 AB(PG70-22)ACHM SURF(1/2") 375.00 TON 412002 COLD MILLING ASPHALT PVMT. 65,632.00 SQYD 414011 ASPH.CONC.PATCH-MAINT. 20.00 TON 415011 ACHM PATCH.EXIST.RDWY. 1,000.00 TON 601001 MOBILIZATION 1.00 L.S. 603010 MAINTENANCE OF TRAFFIC 1.00 L.S. 604003 SIGNS 552.00 SQFT