Specifications include, but are not limited to: CARTER CITY ROAD (KY 7) (MP 16.648) FROM KY 9 EXTENDING NORTH TO KY 2 (MP 21.115), A DISTANCE OF 04.46 MILES.ASPHALT RESURFACING; DGA BASE, QTY 620.00 TON; LEVELING & WEDGING PG64-22, QTY 705.00 TON; CL2 ASPH BASE 0.75D PG64-22, QTY 100.00 TON; CL2 ASPH SURF 0.38D PG64-22, QTY 3,745.00 TON; TEMPORARY SIGNS, QTY 192.00 SQFT; MAINTAIN & CONTROL TRAFFIC, QTY 1.00 LS; MOBILIZATION FOR MILL & TEXT, QTY 1.00 LS; ASPHALT PAVE MILLING & TEXTURING, QTY 160.00 TON; EDGELINE RUMBLE STRIPS, QTY 48,000.00 LF; PAVE STRIPING-TEMP PAINT-4 IN, QTY 25,000.00 LF; PAVE STRIPING-PERM PAINT-4 IN, QTY 96,000.00 LF; PAVE MARKING-THERMO STOP BAR-24IN, QTY 60.00 LF; ASPHALT MATERIAL FOR TACK NONTRACKING, QTY 30.00 TON