Specifications include, but are not limited to: 1. Contractor is responsible for obtaining all city permits through City Development Services Department prior to beginning work and include costs in proposal. 2. Contractor shall remove approximately #1,100 sq-ft of ceiling grid and tiles. Material is to be hauled offsite and disposed of in a professional manner. 3. Contractor shall provide new suspended ceiling grid and acoustical ceiling tiles (Armstrong preferred, Fine Fissured White, 2’ x 2’). 4. Contractor shall provide new ceiling HVAC fixtures (Supply, Return, Exhaust). 5. Contractor shall provide a licensed master electrician to perform all electrical work. 6. Contractor shall upgrade Facility light fixtures: 7. Contractor shall provide new LED lay in light fixtures to dormitory, hallway, captain’s quarter, kitchen, and day room. a. Minimum Specifications – Slim fit, flat panel, 5000K, 2x2 / 2x4 8. Contractor shall update existing ceiling recessed light fixtures with LED retro fit kits in all bath/shower rooms. 9. Contractor shall update existing wall light fixtures with LED retro fit kits in all bath/shower rooms. 10.Electrician to test Z-tron system to ensure correct fixtures are installed and working properly with the alert system. 11.Contractor shall conceal all exposed wires such as tv cables, speaker wires, etc.