Specifications include, but are not limited to: 1.4.1 Carry out the business plan developed by CVFiber and its partners including NRTC, which is approximately 400 miles in 12-15 months (September 2022-December 2023) of fiber backbone buildout in Central Vermont, utilizing fiber and distribution area equipment that was ordered pursuant to the Materials and Warehousing RFP previously issued. Carry out the business plan for the remaining 800 miles for a total build-out of 1200 miles by September 2026 on existing utility owned power poles (95% overhead / 5% underground). 1.4.2 Have sufficient resources to complete this scope within the allotted timeframe, including but not limited to trained personnel and crews, and all appropriate equipment required for transportation of equipment and installations at the specs according to the various utility companies and pole owners, and workspace cleanup and trash removal.