Bid Abstract Posted
************************************************************************************************************************************************
Site Visit Attendence Sheet has been uploaded to this announcement.
**************************************************************************************************************************************************
IAW FAR CLASUE 52.236-27 A site visit has been scheduled for-- Tuesday, 20 OCTOBER 2020 at 10:00 AM local time.
Location and instructions for attendance are attached on document entitled "Pre-bid location". Please be advised on special COVID 19 instructions on this document.
Reservations for attendence and questions concerning the SIte Visit location should be directed to Michael Werdel at 605-245-1815 or Michael.W.Werdel@usace.army.mil
******************************************************************************************************************
This construction project is a Section 203 Tribal Partnership Program Project. This project will be for placement of a Breakwater structure (placement of geotextile, aggregate surface course and clay fill) to include necessary quarried stone and spalls per specifications and drawings. The Base requirement will be for 2000 Linear Feet of structure with four options. Each option will include an additional 750 linear feet of breakwater structure. Total requirement with base and option will total 5000 feet of breakwater structure necessary quarried stone and spalls per specifications and drawings. Period of performance will be 150 days from notice to proceed.