Specifications include, but are not limited to: 0005 201001-000 CLEARING AND GRUBBING LUMP SUM LUMP SUM _________._____ 0010 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0015 207001-001 UNCLASSIFIED EXCAVATION CY 403.000 _________._____ _________._____ 0020 207002-000 SUBGRADE CY 100.000 _________._____ _________._____ 0025 207034-000 FABRIC FOR SEPARATION SY 592.000 _________._____ _________._____ 0030 307001-000 AGGREGATE BASE COURSE, CLASS 10 CY 8.000 _________._____ _________._____ 0035 311006-001 OPEN GRADED FREE DRAINING BASE COURSE CY 66.000 _________._____ _________._____ 0040 408002-001 ASPHALT MATERIAL GA 269.000 _________._____ _________._____ 0045 415005-001 STANDARD MILLING SY 2,310.000 _________._____ _________._____ 0050 601002-001 CLASS B CONCRETE CY 0.700 _________._____ _________._____ 0055 605010-001 TYPE H INLET.