Specifications include, but are not limited to: This project is to replace the field sod, infield dirt area, irrigation lines and regrade the playing surface at the Veterans Memorial Stadium. ; a. Remove and Dispose of existing material i. Prior to removal of the old sod, the field will be sprayed with Round-up or compatible product to eradicate the existing Poa Annua. ii. Remove and dispose of old sod and 3” of rootzone material. iii. Remove and stockpile top 4” of existing infield material on site. iv. Lower infield clay elevation to 6” above dugout entrances. v. Over excavate infield material 5” from proposed finish grade. vi. Remove and dispose of existing irrigation system. b. Prepare the field for new sod. i. Remove peat (black) layer. ii. Install 3” of new rootzone material using 100% rootzone sand to fill in low spots and replace the removed black layer. c. Install new sod. i. The sod area is approximately 97,000 sq. ft. Contractor is responsible for accurate measurements. ii. Sod must be sand-based bluegrass sod. iii. Acceptance ofsod is subject to the Cedar Rapids Kernels head groundskeeper approval. d. Warning track. i. Regrade warning track material. ii. Form all warning track edges. iii. Warning track width must be in compliance with MLB field requirements. e. Install infield dirt material i. Area is approximately 12,000 sq. ft. ii. Reinstall stockpiled 4” of saved infield material iii. Install 1” of new Dura Edge Pro infield mix up to grade. iv. Install new base plugs.