Specifications include, but are not limited to: 0 1720093 #2-1 Rock excavation by means of blasting ($60 per cubic yard, maximum. The Company shall pay a maximum of $60.00 per cubic yard of rock removed by means of blasting.) C.Y. 0 1720094 #2-2 Rock excavation by mechanical means ($125 per cubic yard, maximum. The Company shall pay a maximum of $125.00 per cubic yard of rock removed by mechanical means.) C.Y. 0 1720095 #2-3 Furnish and Install 4" diameter DR-18 C900 PVC water main utilizing traditional trench installation techniques, complete - In pavement L.F. 0 1720096 #2-4 Furnish and Install 4" diameter DR-18 C900 PVC water main utilizing traditional trench installation techniques, complete - In sidewalk L.F. 0 1720097 #2-5 Furnish and Install 4" diameter DR-18 C900 PVC water main utilizing traditional trench installation techniques, complete - In lawn L.F. 0 1720098 #2-6 Furnish and Install 4" diameter PC-350 ductile iron water main utilizing traditional trench installation techniques, complete - In pavement L.F. 0 1720099 #2-7 Furnish and Install 4" diameter PC-350 ductile iron water main utilizing traditional trench installation techniques, complete - In sidewalk L.F. 0 1720100 #2-8 Furnish and Install 4" diameter PC-350 ductile iron water main utilizing traditional trench installation techniques, complete - In lawn L.F. 0 1720101 #2-9 Furnish and Install 6" diameter DR-18 C900 PVC water main utilizing traditional trench installation techniques, complete - In pavement L.F. 0 1720102 #2-10 Furnish and Install 6" diameter DR-18 C900 PVC water main utilizing traditional trench installation techniques, complete - In sidewalk L.F. 0 1720103 #2-11 Furnish and Install 6" diameter DR-18 C900 PVC water main utilizing traditional trench installation techniques, complete - In lawn L.F. 0 1720104 #2-12 Furnish and Install 6" diameter PC-350 ductile iron water main utilizing traditional trench installation techniques, complete - In pavement L.F. 0 1720105 #2-13 Furnish and Install 6" diameter PC-350 ductile iron water main utilizing traditional trench installation techniques, complete - In sidewalk L.F. 0 1720106 #2-14 Furnish and Install 6" diameter PC-350 ductile iron water main utilizing traditional trench installation techniques, complete - In lawn L.F. 0 1720107 #2-15 Furnish and Install 8" diameter DR-18 C900 PVC water main utilizing traditional trench installation techniques, complete - In pavement L.F. 0 1720108 #2-16 Furnish and Install 8" diameter DR-18 C900 PVC water main utilizing traditional trench installation techniques, complete - In sidewalk L.F. 0 1720109 #2-17 Furnish and Install 8" diameter DR-18 C900 PVC water main utilizing traditional trench installation techniques, complete - In lawn L.F. 0 1720110 #2-18 Furnish and Install 8" diameter PC-350 ductile iron water main utilizing traditional trench installation techniques, complete - In pavement L.F. 0 1720111 #2-19 Furnish and Install 8" diameter PC-350 ductile iron water main utilizing traditional trench installation techniques, complete - In sidewalk L.F. 0 1720112 #2-20 Furnish and Install 8" diameter PC-350 ductile iron water main utilizing traditional trench installation techniques, complete - In lawn L.F. 0 1720113 #2-21 Furnish and install LONG water service adjustment (5/8” – 3/4"), complete - Relocate Each 0 1720114 #2-22 Furnish and install LONG water service adjustment (5/8” – 3/4"), complete - Renew Each 0 1720115 #2-23 Furnish and install LONG water service adjustment (5/8” – 3/4"), complete - Transfer Each 0 1720116 #2-24 Furnish and install LONG water service adjustment (5/8” – 3/4"), complete - Discontinue Each 0 1720117 #2-25 Furnish and install SHORT water service adjustment (5/8” – 3/4"), complete - Relocate Each 0 1720118 #2-26 Furnish and install SHORT water service adjustment (5/8” – 3/4"), complete - Renew Each 0 1720119 #2-27 Furnish and install SHORT water service adjustment (5/8” – 3/4"), complete - Transfer Each 0 1720120 #2-28 Furnish and install SHORT water service adjustment (5/8” – 3/4"), complete - Discontinue Each 0 1720121 #2-29 Furnish and install 6” fire hydrant, complete - Short Each 0 1720122 #2-30 Furnish and install 6” fire hydrant, complete - Long Each 0 1720123 #2-31 Preconstruction valve inspection Each 0 1720124 #2-32 Valve excavation and backfill (including backfill, compaction, and pavement restoration) Each 0 1720125 #2-33 Replace existing valve with new valve (Valve Furnished by CONTRACTOR) - 4" Each 0 1720126 #2-34 Replace existing valve with new valve (Valve Furnished by CONTRACTOR) - 6" Each 0 1720127 #2-35 Replace existing valve with new valve (Valve Furnished by CONTRACTOR) - 8" Each 0 1720128 #2-36 Replace existing valve with new valve (Valve Furnished by CONTRACTOR) - 12" Each 0 1720129 #2-37 Replace existing valve with new valve (Valve Furnished by CONTRACTOR) - 16" Each 0 1720130 #2-38 Furnish and Install new valve along new main - 4" Each 0 1720131 #2-39 Furnish and Install new valve along new main - 6" Each 0 1720132 #2-40 Furnish and Install new valve along new main - 8" Each 0 1720133 #2-41 Furnish and Install new valve along new main - 12" Each 0 1720134 #2-42 Furnish and Install new valve along new main - 16" Each 0 1720135 #2-43 Milling - Asphalt S.Y 0 1720136 #2-44 Paving - Asphalt S.Y 0 1720137 #2-45 Concrete Sidewalk - Historical Mix S.Y 0 1720138 #2-46 Concrete Sidewalk S.Y 0 1720139 #2-47 Concrete Driveway - complete S.Y 0 1720140 #2-48 Asphalt Driveway - complete S.Y 0 1720141 #2-49 Tree Free Bore (4" - 8") L.F. 0 1720142 #2-50 Mobilization Each 0 1720143 #2-51 De-mobilization Each When possible, the