Specifications include, but are not limited to: This project will address some troublesome alleys as well as a dead-end street. This project will call for nearly five hundred (500) ton of asphalt, about fifty square yards (50 SY) of PCC removal and replacement with seven inch (7”) of PCC and six inch (6”) of rock. Approximately forty square yards (40 SY) of HMA removal to be tied into the alley. In order to properly repave these alleyways, there will be some sub-grade preparation at each location. In relation to this work, there is some necessary manhole and water valve adjustments. Following the completion of the work, there will be a small bit of seeding, backfill and mulching.; This project addresses the following alleys and dead-end street: The T-shaped alley in the block bounded by 3rd Avenue North, 4th Avenue North, North 4th Street and North 5th Street The alley in the block bounded by 22nd Avenue North, 23rd Avenue North, Roosevelt Street and Garfield Street The alley in the block bounded by 10th Avenue North, 11th Avenue North, North 2nd Street and Pershing Blvd. The dead end of North 10th Street, south of 23rd Avenue North