Specifications include, but are not limited to: The project involves construction of approximately one thousand four hundred thirty-five feet (1435’) of twelve inch (12”) diameter PVC sanitary sewer from the intersection of South 30th Street and Lincoln Way, for eventual connection to the Clinton Community School District Bus Barn. Sewer depth varies, but is designed at approximately ten feet (10’) deep throughout. Construction also includes five (5) forty eight inch (48”) diameter precast sanitary manholes, protection and spreading of topsoil, sedimentation control, final grading, seeding, pavement removal and replacement one hundred seventy seven square yards (177 SY), and coordination with property owners, along with other incidentals.