Specifications include, but are not limited to: Work includes the wells and the well pumps. The wells are used to provide non-potable service water for use in the power plant as well as irrigation water for Veenker Memorial Golf Course and Lake Lavern turnover.; Annual performance testing of all well pumps listed in this specification will be required. A sample test data sheet is attached. All testing will be performed in the spring of the year on a single trip if possible. Testing shall be priced on a per well basis with an additional mobilization/demobilization charge. Additional performance testing may be requested by ISU. Contractor will need to comply with NPDES General Permit No 6 requirements from the Iowa Department of Natural Resources. The well water pollution prevention plan is attached. ; Periodic pump overhauls and repairs will be required based upon performance testing. The contractor will be required to furnish all equipment, materials and labor necessary to remove and reinstall the pump and pump column and any repair parts as required. The overhaul shall include the following work as a minimum. Additional work if required will be in addition to the base contract