Specifications include, but are not limited to: 1) Remove all existing power conductors from the generator to the two WTP buildings, 2) Use CCTV camera to inspect underground conduits from the generator to the two buildings, 3) Install new power conductors and control cables from generator to the two WTP buildings, and 4) Replace two existing Square D PowerLogic meters at the main switchboards for the older building and for the newer building with SEL-735 meters from Schweitzer Engineering Laboratories to allow collection of voltage, power interruption and harmonic data and determine whether power quality problems exist at the WTP. Project includes all labor, materials, equipment, and expenses incidental to completing the work described in the contract documents.