Specifications include, but are not limited to: 1. Mobilization and demobilization to and from the Site. 2. Site preparation including demolition and replacement of existing mechanical, plumbing and electrical components. 3. Removal of kitchen casework and finishes 4. Demolition of existing wall partitions. 5. Installation of new wall partitions and finishes 6. Painting new wall partitions 7. Installation of new suspended ceiling grid systems 8. Installation of a new water closet. 9. Removal and replacement of door frames and doors. 10. Installation of window treatments. 11. Removal of window glazing and installation of new insulated metal panels 12. Installation of new kitchen casework and appliances 13. Installation of wall panels.