Specifications include, but are not limited to: It is the intent of the RTAA to select a qualified Contractor licensed to work in the State of Nevada to modernize four (4) escalators, which serve the arrival and departure areas serving passengers. Leaving the existing escalator backbone in place and installing modular units. Contractor to provide all necessary demolition, modular units, lifting equipment, electrical wiring, controls, motors, and other items to provide a fully functioning set of escalators as put forth in the drawing, specifications, and other documents as mentioned in this ITB. Procurement phase of project shall be 25 weeks, and installation phase shall be 18 weeks. Contractor to provide construction walls, floor and wall protection, and all necessary equipment and parts for lifting of the modular units into place, and all material, labor, tools, expendable equipment, transportation services, permits and fees, utilities required, and all incidental items necessary to provide the scope of work entitled “Escalator Modernization” per the drawings, plans, and specifications provided herein as Attachment D, Special Conditions/Project Manual, Attachment E, Technical Specifications, and Attachment F, Drawings, subject to all terms and conditions contained in this ITB.