Specifications include, but are not limited to: 0005 204001-000 MOBILIZATION LUMP SUM LUMP SUM _________._____ 0010 408001-003 NON-TRACKING ASPHALT MATERIAL GA 3,950.000 _________._____ _________._____ 0015 415005-001 STANDARD MILLING SY 65,837.000 _________._____ _________._____ 0020 601046-001 MODIFIED CONCRETE END POST EA 4.000 _________._____ _________._____ 0025 605012-001 ADJUST INLET TYPE, B EA 1.000 _________._____ _________._____ 0030 605012-001 ADJUST INLET TYPE, C EA 10.000 _________._____ _________._____ 0035 607001-001 TYPE 1 GUARDRAIL, CLASS I LF 4,437.500 _________._____ _________._____ 0040 607001-001 TYPE 1 GUARDRAIL, CLASS V LF 300.000 _________._____ _________._____ 0045 607006-001 THRIE BEAM GUARDRAIL BRIDGE TRANSITION EA 4.000 _________._____ _________._____ 0050 607010-020 GUARDRAIL REMOVAL LF 5,375.000.