Specifications include, but are not limited to: Pricing: Bid prices for 150 Tons "Firm Quantities" items must include delivery and off-loading at the final destination. Compliance Test: Current certified lab test results confirming that the product offered is in compliance with the specifications and must be submitted within ten (10) days upon request, if not submitted with bid. The bidder's failure to submit the test or the failure of the test to meet the RFQ's specifications will cause the MOA to determine the bidder non-responsive and reject the offer. Acceptance Test: At any time after award and prior to the delivery of material, the MOA may test samples of the items offered for inspection and evaluation. If testing is performed at an independent lab, the contractor will be notified of the laboratory's location and contact information. The test will use appropriate test methods as described in the "Specifications" to determine if the product offered meets the RFQ requirements. The contractor may observe testing performed by the MOA if requested in writing and submitted with the sample.