Specifications include, but are not limited to: This project is the first phase of the East Parkway corridor. This phase is to be designed and constructed from Barney Dairy Road to 7th North including a new bridge crossing the South Fork of the Teton River.; East Parkway corridor will advance economic growth as areas around it develop. It will offer a second river crossing within the City, which will reduce congestion on 2nd East, minimize commute times, improve safety and decrease emergency vehicle response times. The road will be constructed as a two lane paved road. The bridge will be designed and constructed to be about 140 feet in length and 76 feet wide to accommodate future road widening. Pedestrian and bike path will be marked across the bridge and will connect with the pedestrian/bike path that will run under the bridge and to the new park that will be constructed along the river.; The scope of work will include Bridge design, Roadway design, Survey, Materials investigation and analysis, Environmental research and analysis, and all corresponding reports/documentation and applicable permits will be required. The selected consultant(s) will be required to develop the project from pre-concept through PS&E delivery and to be qualified in the following areas of expertise: • Bridge Design; • Hydraulic design; • Roadway Design; • Survey; • Environmental; • Geotechnical Investigation/Design; • Traffic Control Design; • Storm Water Pollution Prevention Plan Design; • Public Involvement