Specifications include, but are not limited to: Access to water for use by Contractor will be made available at each location. B. Routine service to be performed semi annually. Contractor shall notify the Facility Supervisor of the date and time the service is to be performed one (1) week prior to the actual work. C. Contractor shall steam clean the concrete portions of the roadway/parking lot surfaces located at the facility (including the concrete platform scale surface) and the floors of the inspection bays. Additionally, at facilities where pit inspection lanes are used, Contractor shall steam clean floors, walls, and covers of the pits. D. Scrubbing and/or brushing may be required to adequately clean surfaces prior to steam cleaning. E. Contractor shall clean up, remove and dispose of effluent waste caused by steam cleaning and provide a copy of invoice from disposal site with their invoice. The cost of waste water disposal must be included in the semi-annual cost. F. Service shall be performed by trained, competent workers. Contractors must be adequately trained in storm water and non-storm water pollution prevention and control and implement Best Management Practices (BMPs) for all contracted steam cleaning related activities. The Contractor shall comply with the Federal Clean Water Act, applicable California Health and Safety Code requirements and the California Water Code. G. Any work found unsatisfactory shall be redone before the next scheduled service at no additional cost to the State. H. Contractor shall take all necessary precautions to protect service locations. Any damage caused by Contractor to state equipment, materials, or other property shall be repaired or replaced by Contractor to the satisfaction of the state at no cost to the state. The state may at its option, repair any damage and deduct from Contractor the cost thereof.