Specifications include, but are not limited to: Outdoor Recreation Yards (Work is to include the four (4) outdoor recreation yards on the northwest side of the building.) a. Replacement of the floor slabs and sub-base aggregate. b. New Interior Recreation Yard foundation drains, floor drains, and associated piping to the main storm trunk line, parallel to the west face of the building. c. New expansion joints and security sealants (floors, walls, windows, and doors) Security sealant is required on the secure side of the facility. Outside of the secure perimeter, non-security sealants are acceptable. d. New exterior security hollow metal doors, frames, thresholds, and hardware at the exterior of the Recreation Yards. 2. Dorm Rooms (Work is to include the extents of the floor crack within the three northwest dorms.) a. Grinding/routing of the floor crack and infill with security sealant.