Specifications include, but are not limited to: provide architectural and engineering programing and design services for the State House Pandemic Mitigation/Renovation Project located at 115 State Street, Montpelier, Vermont; 2.1.1. The consultant shall review the previous studies to understand the needs and complexities of the State House. 2.1.2. Develop a Basis of Design and update as the design evolves with approval from the State at each phase. 2.1.3. Provide an executive summary of the work and process highlighting the recommended solution, major risks, probable cost of construction and related work and schedule. 2.1.4. Address related requirements in the current BGS Design Guidelines and 2022 BGS Space Management Standards and other referenced standards therein. 2.1.5. Evaluate the rooms in the State House to provide the proper spatial distancing for the function of the room. See the attached spreadsheet: "Existing vs. New Committee Room Square Feet (SF)- Based on Occupancy for Design Program Consideration presented on 11/4/21 to the Legislative Advisory on the State House. 2.1.5.1. Based on the results, evaluate the existing rooms/spaces in the State House to determine if renovation of the existing space(s) can provide some or all of the properly sized committee rooms. Include the possible relocation of any non-committee functions or committees that can be housed outside of the State House in space that is presently used/occupied by the Legislature.