Specifications include, but are not limited to: This project is for the renovation of CCMS to improve ADA accessibility, traffic flow, and safety/security. Davis-Bacon Act is applicable to this project.; • Restroom Renovations; • Window Replacement; • Door & Hardware Replacement; • Nurses Office Renovation; • Boiler Replacement (2); • Entrance/Plaza Renovation; • Front Office/Lobby Renovation; • Partial Site Loop; A. Mobilization of job site - Provide and maintain a fully equipped project office facility on-site to perform all required CM duties and meetings and coordination of on-site temporary facilities.; B. Maintain full time on-site construction supervision to provide daily inspections, quality control, monitoring, coordination of the various trades, provide record drawings, and provide a daily work log. Also, assign any Owner purchased materials.; C. Conduct monthly job progress meetings following a CM generated agenda with the Architect and all trades, and follow-up with distribution of minutes to all part;ies. D. Conduct a minimum of bimonthly on-site meeting to review safety and to insure schedule conformance as related to delivery schedules. Provide plan of maintaining original completion date with CPM scheduling updates to all parties.; E. Provide general safety signage and posting for project and see that each Contractor prepares and submits an adequate safety program and monitoring throughout the project.; F. Provide Owner with a monthly review of cash flow to allow investment of funds available.; G. Review change order proposals to verify validity, purpose and cost. Review with the Architect and Owner and process change order requests as required.; H. Review shop drawings for conformance to construction documents and, if presentable, forward to Architect for approval.; I. Monitor certificate of insurance for expiration from all contractors and confirm Owner's builder's risk policy.; J. Compile payment requests, verify correctness and forward to Architect for approval. CM to sign cover sheet stating that application has been reviewed and is recommended for payment.; K. Provide Architect and Owner with a monthly analysis of all bid packages indicating amount of contract completed and remaining, monies paid, retained, and owed.; L. Assist Architect in preparation of BG-4, conducting final inspections, approvals and Certificates of Occupancy.