Specifications include, but are not limited to: A. Project Scope of Work Includes: 1. The existing data infrastructure in the Armory and RTI building at the Sioux Falls Foss Field will be updated. This includes removing old cable backbone, installing new Category 6 cable and additional data receptacles. The server room will be relocated from Room 140 to Room 184A. Fiber cable will be installed between all three Server Rooms and IDFs. B. Building will be occupied during construction. Contractor shall avoid undue disturbance to building occupants. C. Contractor shall not block or obstruct building exits in any way. D. Storage areas for materials will be provided within close proximity to the buildings. Exact location will be discussed in greater detail at the preconstruction meeting.