Specifications include, but are not limited to: Remove and dispose of all existing track surface down to existing asphalt. Approximately 102,000 sq ft. - Repair existing asphalt as needed up to 300 SF - Apply new Synthetic Track Surface in color to be determined in all areas. See attached specification for Synthetic Track Material. - Stripe eight lane track lanes - Remove 3200 sq ft asphalt on South end of grass field. - Remove 215 linear feet of concrete curb mow strip on South End - Remove approximately 1600 sq ft of existing grass field. - Grading and site preparation as needed. To - Relocation of existing soccer goal sleeves - Irrigation stem modifications including six new Hunter i40 or equivalent rotor heads to match existing heads, lateral piping for relocation of 48 existing rotor heads and new 2” zone valve - Install 8” mow curb on south edge of soccer field - Install Patriot Bermuda grass sod to match existing grass variety at expanded area. Approximately 4500 sq ft of new sod. - Contractor must show proof of completion of at least five athletic grass or synthetic turf field installations or renovations in the last 5 years. - Field renovation must start by June 15, 2022 and be completed by July 1, 2022. Track surface removal and installation must be begin by July 2 and be completed by August 15, 2022.