Specifications include, but are not limited to: STBG-SWAP-C097(144)--FG-97 ROUTE: K25; On K25, from Relocated Port Neal Road South 1.8 Miles to Gelita Plant Entrance, Sec 7 and 18 T87 R47; QTY 8.00 EACH APRONS; QTY 14.00 ACRE CLEARING & GRUBBING; QTY 178.00 LINEAR FOOT CULVERT PIPE; QTY 9,061.00 CUBIC YARD EMBANKMENT-IN-PLACE; QTY 4,666.67 SQUARE YARD ENGINEERING FABRIC; QTY 16,443.79 CUBIC YARD EXCAVATION CLASS 10; QTY 368.81 CUBIC YARD EXCAVATION CLASS 20; QTY 1,300.00 LINEAR FOOT FENCE, FIELD; QTY 70.00 CUBIC YARD FLOWABLE MORTAR; QTY 28.67 CUBIC YARD GRANULAR BACKFILL; QTY 5,803.00 TON GRANULAR SHOULDERS, TYPE B; QTY 8,001.00 TON MACADAM STONE BASE; QTY 5,650.40 CUBIC YARD MODIFIED SUBBASE; QTY 14.00 ACRE MULCHING; QTY 304.32 STATION PAVEMENT MARKINGS; QTY 27,133.32 SQUARE YARD PAVEMENT, P.C.C.; QTY 332.00 POUND REINFORCING STEEL; QTY 24,821.28 SQUARE YARD REMOVAL OF PVMNT/DRIVES/SDWK; QTY 20,308.00 LINEAR FOOT SILT FENCE; QTY 14.00 ACRE STABILIZING CROP, SEED & FERT.; QTY 6.50 CUBIC YARD STRUCTURAL CONCRETE