Specifications include, but are not limited to: The Shaftsbury Town Plan identifies a lack of wastewater provision as a potential impediment to village(re)development and a constraint on the addition of housing at densities similar to the existing village.Additionally, commercial or larger scale residential development may not be economically feasiblebecause on-site wastewater systems are required. In 2006 a Wastewater Feasibility Study for SouthShaftsburywasconductedbyStoneEnvironmentalInc.ofMontpelier.NoActionwastakenontheproposalscontainedinthatstudy.This study has four goals:1.In consultation with Town officials use available geological, topographical and built form datatoestablish the boundaries of the wastewater study area.2.Accurately describe existing conditions in the study area.3.Present potential wastewater solutions that can ensure the ongoing viability of the studyarea.4.Propose innovative solutions that have a clear permitting path and accurate installation,operating and maintenance cost information.