Specifications include, but are not limited to: STPN-175-1(87)--2J-67 ROUTE: IOWA 175 In Onawa, IA 175 from 20th St to 2nd St 1.00 LUMP SUM CONSTRUCTION SURVEY 2.00 EACH CONTROL CABINET 6,798.10 LINEAR FOOT CURB & GUTTER P.C.C. 34,740.00 LINEAR FOOT ELECTRICAL CURCUITS 3,054.43 CUBIC YARD EXCAVATION CLASS 10 101.70 CUBIC YARD FLOWABLE MORTAR 288.90 CUBIC YARD GRANULAR BACKFILL 1,149.10 TON GRANULAR SHOULDERS, TYPE A 23.00 EACH HANDHOLE 759.70 TON HOT MIX ASPHALT 11.00 EACH INTAKES & MANHOLES/UTILITY ACCESS 30.00 EACH LIGHTING POLES 1,609.90 CUBIC YARD MODIFIED SUBBASE 1.30 ACRE MULCHING 25.00 EACH PATCHES BY COUNT 182.70 SQUARE YARD PATCHES, FULL-DEPTH 1,699.00 SQUARE FOOT PATCHES, PARTIAL-DEPTH P.C.C. 309.36 STATION PAVEMENT MARKINGS 3,234.90 SQUARE YARD PAVEMENT SCARIFICATION 29,646.50 SQUARE YARD PAVEMENT SURFACE REPAIR 6,398.80 SQUARE YARD PAVEMENT, P.C.C. 175.00 LINEAR FOOT POSTS, METAL, FOR SIGNS 8,298.10 SQUARE YARD REMOVAL OF PVMNT/DRIVES/SDWK 1.30 ACRE SEEDING & FERTILIZING 676.30 LINEAR FOOT SEWER, STORM 53.28 STATION SHOULDER CONSTRUCTION