Specifications include, but are not limited to: • Remove existing 2400v 3 phase main service • Remove existing conductors and 2 service poles • Demo top 10' of single-phase service pole • Coordinate with MonPower and 811 for disconnect/reconnect and locates • Install 2 - 50' class 5 power poles • Install 3 - 25kva / 2400v - 480v 3 phase transformers with triple tree mounting hardware • Install 3 main line fuse cut outs with 3-amp fuses • Install 3 new main line fuses at tap location in existing cut outs • Install 3 runs of main line #2 approximately 360' x 3 • Install 2 service pole down guys with covers and pole grounding • Reconnect existing 120/240v - 25kva transformer to both existing 120/240v services • Install all new hardware, bracing, and gear