Specifications include, but are not limited to: STOCKPILE SITE #1: PHILLIPSBURG MAINTENANCE YARD; ROUTE: MT-1; MILEPOST: 38.028; MMS STOCKPILE NUMBER: 011105; SPECIFICATIONS FOR WORK: Provide all labor, materials, equipment, and incidentals necessary to produce 1,125 tons or 750 cubic yards of sanding material. Add 20% contractor furnished salt by weight to 1,125 tons of sanding material or add 20% contractor furnished salt by weight to 750 cubic yards of sanding material. Contractor is required to stack all blended material in salt/sand storage facility. Stockpile material using a minimum 60’ hopper fed stacker belt. Stockpile material to facilitate water runoff.; STOCKPILE SITE #2: DRUMMOND YARD; ROUTE: MT-1; MILEPOST: 62.8; MMS STOCKPILE NUMBER: 011103; SPECIFICATIONS FOR WORK: Provide all labor, materials, equipment, and incidentals necessary to produce 8,000 tons or 5,333 cubic yards of sanding material. Add 10% contractor furnished salt by weight to 2,250 tons of sanding material or add 10% contractor furnished salt by weight to 1,500 cubic yards of sanding material. Stockpile material using a minimum 60’ hopper fed stacker belt. Stockpile material to facilitate water runoff.; STOCKPILE SITE #3: PHOSPHATE STOCKPILE SITE; ROUTE: I-90; MILEPOST: 170.23; MMS STOCKPILE NUMBER: 011150; SPECIFICATIONS FOR WORK: Provide all labor, materials, equipment, and incidentals necessary to produce 2,250 tons or 1,500 cubic yards of sanding material. Add 10% contractor furnished salt by weight to 1,125 tons of sanding material or add 10% contractor furnished salt by weight to 750 cubic yards of sanding material. Stockpile material using a minimum 60’ hopper fed stacker belt. Stockpile material to facilitate water runoff.